A modern APCS (automated process control system) of a nuclear power plants (NPP), is implemented as networked control system. In the paper, model based on the “Network calculus” for an NPP APCS segment is presented. The tree models differencing by its complexity and accuracy are investigated. A method of calculation of time characteristics of the system under worst combination of input conditions is verified.